The main objectives of this work package are the following:

  • Installation of additional equipment needed for DR actions proposed in the Sim4Blocks project
  • Translate energy management strategies into control algorithms for building or blocks of buildings energy management systems
  • Determine which control decisions are taken on a decentralised or central management level as a function of stakeholder intentions
  • Test energy management components in HiL environments
  • Design and implement communication interfaces and access to data management system
  • Design and implement a data infrastructure for district level DR
  • Implement DR strategies in the pilot sites and apply commissioning procedures
  • Develop joint methodology for continuous commissioning of EM systems
  • Develop, test and optimise software versions

Work package point of contact

Dirk Pietruschka – dirk.pietruschka@enisyst.de 

I am managing director of Enisyst GmbH, a company providing intelligent control solutions for thermal and electrical energy systems on building and district level. In Sim4Blocks we are responsible for the implementation of control hardware and software enabling DR activities in different buildings and applications in Wüstenrot.